News
Notes from our sites, corporate announcements and technical articles.

Göztepe renewal: Block C reaches roof level
The last typical slab on Block C was poured; owners were briefed at the October meeting.

Occupational H&S management system surveillance audit completed
The certification body’s surveillance audit across three sites closed without non-conformities.

Rainwater recovery on our sites: first-year results
Collection systems at five sites covered a large share of the water used for curing and dust suppression.

Concreting in winter: six measures we apply on site
Our standard site procedure for preventing strength loss when concreting in cold weather.

2027 engineering internship applications open
Applications are open for our eight-week site internship for civil, mechanical and electrical engineering students.

Adapazarı bridge: balanced cantilever enters the final stretch
Two segments remain before the two cantilevers meet over the 110 m main span.

Five rules for transparent communication with owners in urban renewal
Lessons from Göztepe: monthly meetings, written schedules and an open site.

Çaykara Link Tunnel: preparing for final acceptance
After a year in operation, the final acceptance file for the tunnel is being prepared.