Ongoing · Kayseri

Kocasinan Education Campus

A campus of faculty buildings, a central library and student housing on an 18-hectare site in Kayseri.

The programme was phased around winter: structures will be topped out by November so that interior works continue under cover through the cold months.

Precast façade panels are produced at a plant 40 km away, each tracked with a QR code.

Transparency board

On site this week

All sites
Overall progress%37
3 pts behind programme
Start
June 2025
Expected completion
September 2027
Remaining
11 months
Last update
30 September 2026 (5 days ago)

Work packages

  • Excavation and foundations%100
  • Structural frame%64
  • Façade and glazing%12
  • Mechanical services%18
  • Electrical services%15
  • Finishes and interiors%0
  • Landscaping and external works%0

Planned / actual

02550751002025/062027/09Today
Planned Actual

Site diary

  1. Library reaches roof level

    The library’s top slab was poured; steel roof fabrication is 60% complete in the shop.

    121 on site Cool, 12°C
  2. Dormitory level 3

    The dormitory block reached level 3 with a one-floor-per-day tunnel-form cycle.

    116 on site Sunny, 17°C
  3. Faculty B foundation pour

    1,240 m³ were poured continuously over 19 hours into Faculty B’s raft.

    109 on site Clear, 21°C